The Ranking
Our top 9 deck builders in Ottawa
Ottawa is hard on decks. Winters bring deep frost, heavy snow and repeated freeze and thaw cycles, and the clay soils found across much of the city move when they freeze. A deck that is not set on proper footings can heave, rack and pull away from the house within a few seasons, which is why the footing plan matters more than the colour of the boards.
Most Ottawa decks are built in one of three ways. Pressure treated spruce is the low cost choice and needs staining every few years. Western red cedar costs more, looks warmer and still needs regular care. Composite and PVC boards from brands such as Trex, TimberTech and Azek cost the most up front but resist rot and need little more than washing, and several builders on this list also install vinyl or aluminum decking. Ask each builder to price two materials so you can compare the long term cost.
Footings have to sit below the frost line. The Ontario Building Code requires deck footings to reach undisturbed soil below the depth of frost penetration, and in Ottawa's clay that generally means at least 1.2 metres below grade, deeper where frost goes further. Some builders pour concrete piers and others drive helical piles, which are steel screws set below the frost line by machine. Either can work if the design is right for your soil, so ask which one your quote includes and how deep it goes.
The City of Ottawa requires a building permit for a deck attached to a house with a walking surface more than 600 mm, about 24 inches, above the adjacent grade, and the permit comes with inspections, including a footing inspection before concrete is poured. The Ontario Building Code also requires a guard on any deck surface more than 600 mm above grade, at least 900 mm high where the deck is 1.8 metres or less off the ground and 1070 mm where it is higher. Ledger boards that tie a deck to the house need proper fastening and flashing, and that detail should appear on the permit drawings. Zoning By-law 2008-250 limits how far a raised deck can project into a rear yard and how close it can come to a lot line, so check your lot with the city's zoning service before you settle on a size. Condominium corporations and some newer subdivisions in Kanata, Barrhaven, Riverside South and Orleans also have their own rules on deck size, materials and colours.
Call Ontario One Call at 1-800-400-2255 before any digging, since footings and piles go deep enough to hit gas, hydro or cable lines. Ontario has no provincial licence for deck contractors, so the checks fall to you: ask for a certificate of liability insurance, a WSIB clearance certificate so you are not on the hook for an injured worker, the written warranty for both workmanship and materials, and confirmation of who will apply for the building permit.