Researched rankings in 38 cities across the United States and Canada. Re-checked every 90 days.

TenBestFindThe best, verified
Add Your Business

Remodeling

Home additions near you

Room additions and second-storey work.

Prepared by the TenBestFind Editorial TeamUpdated September 2026

Find home additions in your area

Enter your city or postal code and we will take you to the remodeling ranking for that market.

  • Part of

    Remodeling

  • Companies offer it

    None recorded yet

  • Cities covered

    No shortlist yet

  • Last checked

    September 2026

The work

What home additions actually involves

Approvals and foundations come long before anybody builds

An addition is a construction project rather than a renovation. There is design, structural engineering, planning or zoning approval, a building permit, foundations, connection to the existing structure, and the extension of every service into the new space.

The lead time before work starts is often as long as the build. Approval timescales are outside everybody's control and they are the usual reason an addition takes a year rather than the months the construction itself needs.

Where the new roof meets the old, and where the new foundation meets the existing one, are the two junctions that cause most later problems. They deserve detail on the drawings rather than being left to the site.

Design and build

Decide early who owns the drawings

An addition can be arranged as design and build, where one firm does both, or with an independent architect or designer producing drawings that contractors bid on. They produce very different projects.

Design and build is simpler to manage and gives one point of responsibility, at the cost of an independent check on what is being proposed and what it should cost.

Separating them costs more in fees and gives you comparable bids and somebody on your side of the table during construction. On a project this size, that is usually worth it.

Failure points

Two things that go wrong

All remodeling contractors research →
  1. Allowances standing in for decisions

    Ask: “What allowances are in this bid, and what do they actually buy?”

    Bids contain allowances for things not yet chosen: finishes, fittings, kitchens. A low bid is often a bid with low allowances, which does not mean a cheaper project, only a later reckoning. Compare the allowances, not the totals.

  2. How the existing house is affected

    Ask: “What work to the existing house is included, and what has to be brought up to code?”

    Tying into an existing building means opening walls, possibly moving services, and living in a house that is part building site. What gets protected, what gets made good, and whether anything existing has to be upgraded to current code are all real costs that sit at the edges of the scope.

Before you book home additions

How we rank →

Six checks, in the order they save you the most. None of them takes longer than a phone call, and the first one is the reason two quotes for the same job can be a thousand apart.

  1. In-house or subcontracted

    Ask whether the crew doing this specific work is on their payroll. Plenty of companies list a service and hand it straight to somebody else, which is not wrong, but it changes who is answerable when something goes back.

  2. The licence for the parent trade

    Look the number up with the authority that issues it rather than reading the certificate they send you. What a licence covers, and whether one is needed at all, changes by state and province.

  3. Insurance, confirmed with the insurer

    A current certificate sent to you by the insurer, not a photocopy from the company. Ask for liability and, where crews are on site, workers' compensation.

  4. What the quote leaves out

    Removal, disposal, subfloor or substrate work, permits and making good afterwards are where two quotes on the same job separate. Ask for the exclusions in writing next to the inclusions.

  5. Two warranties, not one

    The manufacturer covers the material and the company covers the workmanship. Get the second in writing, with its length, and ask whether it transfers if you sell.

  6. How a change is priced

    Agree before the deposit how anything found on the way is priced and approved. The moment to settle that is while you are still choosing between companies, not on the day somebody lifts a floorboard.

Read first

Remodeling guides

All guides →

Common questions about home additions

Ask us something else →

  • Who handles home additions?

    Home additions is handled by remodeling contractors. Not every company in the trade takes this work on, so each ranking lists the services a company genuinely performs rather than everything it advertises.

  • What should I ask before booking home additions?

    Ask what the quote includes and excludes, who is doing the work, whether a permit is needed and who is pulling it, and what the workmanship warranty covers. Get the answers in writing before anyone starts.

  • How do I compare quotes for this?

    Put them on one sheet line by line. Differences in price almost always turn out to be differences in scope, material grade or warranty length rather than margin.

  • Is home additions priced separately from the rest of the job?

    Usually it is a line inside a larger quote rather than its own invoice, which is exactly why the exclusions matter. Ask for it itemised so you can compare that line between companies instead of comparing two totals.

For remodeling

Do you offer home additions?

Claim your profile so the services you actually perform are the ones recorded here, alongside your licence, hours and coverage. Neither claiming nor advertising buys a ranked position.

Find home additions near you