Researched rankings in 38 cities across the United States and Canada. Re-checked every 90 days.

TenBestFindThe best, verified
Add Your Business

Remodeling

Kitchen remodeling near you

Layout changes, cabinetry, counters and appliances.

Prepared by the TenBestFind Editorial TeamUpdated September 2026

Find kitchen remodeling in your area

Enter your city or postal code and we will take you to the remodeling ranking for that market.

  • Part of

    Remodeling

  • Companies offer it

    None recorded yet

  • Cities covered

    No shortlist yet

  • Last checked

    September 2026

The work

What kitchen remodeling actually involves

Where the plumbing and the wiring are decides most of the budget

A kitchen remodel divides into work that keeps the existing layout and work that moves things. Replacing cabinets, worktops and appliances in the same positions is expensive but predictable. Moving the sink, the range or a wall brings in plumbing, electrical, structural and permit work, and that is a different order of cost.

The other large variable is cabinetry. Stock, semi-custom and custom cabinets can differ by a factor of three for a kitchen of the same size, and they also differ in lead time by months.

Order the appliances before the cabinets are made. Appliance dimensions vary more than people expect, and a cabinet run built to assumed sizes is an expensive thing to alter afterwards.

The contingency

Hold back a contingency, because the walls will have something in them

Kitchens sit against plumbing, wiring and sometimes structure, all of it hidden until demolition, and in an older house something is usually not what anybody assumed.

Ten to twenty percent held back is the normal advice, and on a house over fifty years old the upper end is more realistic than the lower.

That money is not a buffer for changing your mind. Keeping the two separate, contingency for what is found and a different budget for what you decide to upgrade, is what stops a project drifting.

Failure points

Two things that go wrong

All remodeling contractors research →
  1. No written schedule of what happens when

    Ask: “Who is coordinating the trades, and can I see the schedule with the sequence on it?”

    A kitchen is a sequence of trades and a delay anywhere pushes everything after it. Without a written schedule and a named person coordinating it, the gaps between trades become the longest part of the job and nobody owns them.

  2. Change orders agreed verbally

    Ask: “How are changes priced and approved once work has started?”

    Mid-project changes are normal. Agreeing them in conversation is where disputes come from. Every change should have a written price and a note of its effect on the schedule, signed before the work is done rather than invoiced after.

Before you book kitchen remodeling

How we rank →

Six checks, in the order they save you the most. None of them takes longer than a phone call, and the first one is the reason two quotes for the same job can be a thousand apart.

  1. In-house or subcontracted

    Ask whether the crew doing this specific work is on their payroll. Plenty of companies list a service and hand it straight to somebody else, which is not wrong, but it changes who is answerable when something goes back.

  2. The licence for the parent trade

    Look the number up with the authority that issues it rather than reading the certificate they send you. What a licence covers, and whether one is needed at all, changes by state and province.

  3. Insurance, confirmed with the insurer

    A current certificate sent to you by the insurer, not a photocopy from the company. Ask for liability and, where crews are on site, workers' compensation.

  4. What the quote leaves out

    Removal, disposal, subfloor or substrate work, permits and making good afterwards are where two quotes on the same job separate. Ask for the exclusions in writing next to the inclusions.

  5. Two warranties, not one

    The manufacturer covers the material and the company covers the workmanship. Get the second in writing, with its length, and ask whether it transfers if you sell.

  6. How a change is priced

    Agree before the deposit how anything found on the way is priced and approved. The moment to settle that is while you are still choosing between companies, not on the day somebody lifts a floorboard.

Read first

Remodeling guides

All guides →

Common questions about kitchen remodeling

Ask us something else →

  • Who handles kitchen remodeling?

    Kitchen remodeling is handled by remodeling contractors. Not every company in the trade takes this work on, so each ranking lists the services a company genuinely performs rather than everything it advertises.

  • What should I ask before booking kitchen remodeling?

    Ask what the quote includes and excludes, who is doing the work, whether a permit is needed and who is pulling it, and what the workmanship warranty covers. Get the answers in writing before anyone starts.

  • How do I compare quotes for this?

    Put them on one sheet line by line. Differences in price almost always turn out to be differences in scope, material grade or warranty length rather than margin.

  • Is kitchen remodeling priced separately from the rest of the job?

    Usually it is a line inside a larger quote rather than its own invoice, which is exactly why the exclusions matter. Ask for it itemised so you can compare that line between companies instead of comparing two totals.

For remodeling

Do you offer kitchen remodeling?

Claim your profile so the services you actually perform are the ones recorded here, alongside your licence, hours and coverage. Neither claiming nor advertising buys a ranked position.

Find kitchen remodeling near you